How Much Concrete Do I Need for a 24×24 Slab?

A 24 ft × 24 ft slab at 4 inches thick needs about 7.11 cubic yards of concrete (192 cubic feet). Order 7.5 yards to cover overage and grade variation. The calculator below starts with those dimensions — adjust thickness to match your plans.

Concrete volume needed
— cubic yards
Enter your dimensions to start.

    Pre-filled for this pour with a 5% waste margin. Adjust the fields and the volume, bag counts, and metric conversions update instantly.

    How we calculate it

    Volume in cubic feet is length × width × (thickness ÷ 12) for slabs, or π × radius² × depth × hole count for round footings. That volume is divided by 27 for cubic yards, and divided by 0.6 or 0.45 to estimate 80 lb or 60 lb bags.

    See the full concrete calculator and bag yield table →

    Questions about this pour

    How many yards of concrete for a 24×24 slab?

    7.11 cubic yards at 4 inches thick. Most contractors order 7.5 yards to allow for a slightly uneven subgrade and spillage.

    Can a concrete truck reach a 24×24 pour?

    Most chutes reach about 16–18 feet from the truck, so a 24 ft wide slab usually needs wheelbarrows or a pump. A line pump is typically the cheapest way to move 7+ yards.

    How many control joints for a 24×24 slab?

    Rules of thumb: joints every 8–10 feet, and panels no more than 1.5 times longer than they are wide. That usually means dividing the slab into a 3 × 3 grid of roughly 8 ft panels.

    Other concrete pours